Start with a workplan
Define the target surface, acceptance criteria, and evidence before capturing proof.
Understand proof state
Learn how evidence moves from diagnostic capture to accepted current proof.
Review workplans
Use the production workplan route and its data plane together.
Protect tenant boundaries
Keep repository, tenant, and account authority aligned for every operation.
Understand the system
Follow the source, runtime, evidence, and reviewer planes.
Check reviewer readiness
Verify deployment, data-plane, and proof freshness before review.
What EyeParity verifies
- Rendered state: the exact route and viewport a reviewer needs to inspect.
- Deterministic state: route metadata, API results, DOM facts, and artifact integrity.
- Evidence freshness: whether proof was produced after the relevant implementation and runtime event.
- Work-to-proof traceability: which task, workplan, and repository own the evidence.
An HTTP 200 response proves transport availability. It does not, by itself, prove that a page is semantically correct or that a workplan is complete.